← Back to site PELAGOS Vantage Program
Build Log · Entry 02 Apr 2026

Vantage taking physical form

Bench testing complete, full-vehicle assembly underway. The architecture proven in the digital twin is moving directly into hardware.

Hardware/Vantage V0/Bench Test
Watch on YouTube
Video · Bench test and assembly

What started as a simulation effort is progressing into hardware. Bench testing on the platform was completed under controlled conditions.

Assembly of the full vehicle is currently underway. The architecture demonstrated in our March digital twin work is being carried directly into the physical build.

The next phase is initial in-water testing: pool trials, followed by open-water deployments. Assembly continues toward first water entry.

Pelagos Frontier Join the Frontier