← Back to site PELAGOS Vantage Program
Build Log · Entry 04 14 Jul 2026

Pool trials, single-operator carry

Vantage V0 out of the water after its latest pool test. Built for single-operator handling and rapid field deployment.

Pool Test/Ergonomics/Vantage V0
Vantage V0 carried under one arm after the pool test
Fig. 01 · Single-operator carry, post test
Vantage V0 held after coming out of the pool
Fig. 02 · Fresh out of the water

Surf's up. Vantage V0 is out of the pool after its latest test session, and it left the water the way it is meant to: carried by one person.

No crane, no cradle, no support crew. A single operator lifts the vehicle out and walks away with it. That handling requirement has shaped the hull since day one, and it is holding up in practice: rapid field deployment with a natural ergonomic carry.

Pool sessions are validating trim, handling, and recovery routines ahead of open-water work. Salt water is next.

Pelagos Frontier Join the Frontier